Changer de langue :
With this ship unloading crane, it is not just the container that can be raised and lowered; the entire crane girder can be moved vertically. This considerably reduces the lifting and lowering time. However, the previous energy supply solution with free-hanging cables was very susceptible, as they became entangled each time in strong winds and had to be untangled again with a considerable labour input of up to 30 working hours. With new e-chains from our company, however, the cables are now safely guided.

Download the case study
This case study clearly describes how EMO B.V. was able to achieve running performances of over 375,000km on its STS cranes with igus chains for cranes®.
Virginia International Terminals, Michael Petty, Norfolk, Virginia, USA
En personne :
Du lundi au vendredi de 8h à 20h. Le samedi de 8h à 12h à Cologne en Allemagne
En ligne :
24h/24